I've just updated a drawing that was about 40mb originally with a custom count of the trees on the site - about 400 of them. This has increased the file size just ever so slightly to 3,376mb!!!
Has anyone else come across such an issue?
I know that you like to capture as much information as possible with your markups @Vince French but you might have overdone something with this one! š
Just repeated the process @David Cutler but this time using the built in count tools instead of a custom tool - there were 425no trees and the file size increased by 1mb š¤·
Nearly 8mb per tree wasn't a bad effort on the first attempt @David Cutler . Although all that the extra metadata told me was that there were 425no trees and that they were green markups š¤£
It would be nice is the Markups list could be docked (not floating) on the right side of the screen.
Hi!, I'm a senior technician in an architect office, and I regurlarly do some site surveillance and dificiency reports. I am looking for an app on a tablet to consult plans (pdf format ideally), annotate them with comments (ideally speak-to-text) that will generat a list of comments with a "pin" on the pdf plan localisingā¦
Our company used bluebeam studio on the USA server before we had access to AU licensing. Now we have all AU licenses logging in to the USA studio server, and it tangles itself every day (worse with azure AVD). USA studio login seems to time out and when I log back in it removes the login to the AU license and logs in aā¦
If you choose an area and set the color, line weight and so on, then click out of measurement you have to then go back and redo all the particulars for that item that you are trying to take off. Can this be remedied? Onscreen allows the user to set a group of items to use repeatedly throughout a set of drawings (color,ā¦
Curious if anyone adds a "time" or "man hours" columns in their markups list when doing takeoff. I have some ideas but unsure if they will actually be useful. For example: 10 LF of footing = 1 man hour. Does anyone have any tips on adding custom columns on their markups for time? I already utilize it for material cost perā¦
Good Morning Has anyone successfully imported their take-off from Bluebeam via excel into Trimble Contract Master Estimation software and have you managed to link an item in that take off to your database item?
Am I missing something? I was previously using revu ipad in the field for viewing drawings and scaling plans. I have recently updated to a bluebeam subscription and downloaded the new app on the ipad, I have not been able to figure out how to scale on the ipad. I have been able to do this on the web app on my computer butā¦
Imagine placing a door symbol and Revu automatically attaching a mini BOQ for leaf, frame, hardware and labor, all rolling up into one smart cost object that updates as you copy or move it.
Following on from a discussion that I was having with someone the other day, how many of you use a custom profile? And, more importantly from my point of view, how many of you use multiple profiles? I have many profiles - different trades, several for measuring groundworks (civil engineering) alone, etc.. I thought manyā¦
In our new lighting projects, we are tasked with adding barcodes to each lighting fixture in a diagram. When printed, these barcodes can be scanned to control the lighting fixtures. It would be ideal to have an option to generate quick, generic barcodes instead of taking pictures, saving them, and then adding them as JPGā¦