Hi Community! I'm creating a drawing status stamp for my Team of Design Managers. We are a major contractor. I have created a finished template (containing two drawing statuses with tickboxes within it). I have 2 x issues I'm facing so far; one being around the Dynamic Date Tool and the other being Dynamic Tickbox Tool. Issue #1 I want my stamp to have a dynamic date feature, so that when the stamp is applied to a drawing, the date of the stamp automatically changes to suit the day it is applied. For example, I use it today the stamp should state 14/04/2025. I use the stamp on a digital dwg tomorrow, the date should state 15/04/2025 automatically (without the need to amend dates manually). Issue #2 I would also like to understand why my dynamic tickboxes won't allow me to check or uncheck the box when i apply the stamp. When I apply the stamp, it gets applied as a 'sticker' rather than an amendable or checkable stamp (where you should be able to uncheck or check the tickboxes). Please can you help troubleshoot this for me, I would sincerely appreciate any support. I cannot find a tutorial or means to understand why my stamp won't behave like a standard stamp.